COMMERCIAL SOLAR
Solar power for your business.
From opening the tills to switching off the lights, your power needs change through the day. Choose a Shabang HFP inverter for the hours when your equipment runs together.
Compare HFP modelsPlan around your working day.
- At peak hours
- List the equipment running at your busiest time. Include lighting, checkout terminals and cooling, along with the extra power compressors draw when they start.
- During an outage
- Which services need to stay on? A router and a payment terminal draw a different load from a display fridge. Note the hours of backup each one needs.
- Before choosing a model
- Share your equipment list, solar panel specifications and battery voltage with your installer. Use the model datasheets to check output and input limits.
Compare the HFP range.
Review the main specifications side by side. Each product page includes detailed technical data and supporting documents.
| Rated output | Battery system | Maximum PV input |
|---|---|---|
| HFP 3.3 kW | 24 V | 5,000 W |
| HFP 6.3 kW | 48 V | 7,000 W |
| HFP 10.3 kW | 48 V | 12,000 W |